Lab Trial Produces Low Carbon, High Strength Concrete
Released
Released
Announcement PDF
ASX ANNOUNCEMENT
3 November 2023
LAB TRIAL PRODUCES LOW CARBON,
HIGH STRENGTH CONCRETE
HIGHLIGHTS
Laboratory trials conducted in collaboration with Murdoch University under
the recently announced licensing agreement have successfully produced low
carbon concrete using Suvo Metakaolin.
The five samples tested showed promising results, with an average strength
of 52MPa, surpassing the strength of many traditional concrete applications.
Metakaolin has the potential to reduce greenhouse gas (“GHG”) emissions by
50% compared to ordinary portland cement (‘OPC’).
Cement production is the single largest industrial source of GHG and
accounts for 8% of global emissions – equivalent to the entire global car
fleet1.
The global concrete market is forecasted to be USD $821.6 billion by 20262.
Suvo Strategic Minerals Limited (ASX: SUV) (“Suvo” or “the Company”) is pleased to
provide results from its recently completed laboratory trials completed by the team
at Murdoch University, targeting a reduction in the carbon footprint of concrete –
the world’s single largest industrial emitter of GHG emissions (ASX Announcement
30 October 2023).
The trials comprised five samples which returned an average strength test of
52MPa, exceeding the strength of most concrete applications currently in use.
1 Beyond Zero Emissions
2 Global Estimate Markets Research & Consultants
Aaron Banks
Oliver Barnes
Agu Kantsler
NON-EXECUTIVE CHAIRMAN
NON-EXECUTIVE DIRECTOR
NON-EXECUTIVE DIRECTOR
Suvo Strategic Minerals Ltd. ABN 97 140 316 463
Head Office: Level 11, 40 The Esplanade, Perth, Western Australia 6000
Operations: 3610 Glenelg Highway, Pittong, Victoria 3360
As part of the laboratory trials undertaken by Murdoch University, Suvo’s Metakaolin
was used with other readily available inputs to create a low carbon, geopolymer
concrete.
Geopolymer concrete is a low emission, environmentally-friendly alternative to
traditional OPC. It's produced by chemically reacting aluminate and silicate-bearing
materials with caustic activators like metakaolin, fly ash, ground blast furnace slag,
and other waste-derived components.
In OPC production, about 50% of GHG emissions result from limestone combustion
in a kiln at 1,400°C. The energy for the kiln constitutes 40%, while plant electricity
and transportation account for the remaining 10%.
Based on scholarly research, the production of Metakaolin compared to OPC
achieves a 50% reduction in GHG emissions as the production of Metakaolin
necessitates a lower temperature (700°C compared to 1,400°C ), hence a lower
carbon footprint for energy required, and produces water rather than carbon
dioxide (source: Cutting Cement Industry CO 2 Emissions through Metakaolin Use in
Construction). This is stark contrast to what is currently available in the cement
industry.
The trial led by Murdoch sourced Kaolin from the Company's Gabbin deposit. This
was subsequently converted into Metakaolin by global cement technology specialist
FLSmidth at their Bethlehem laboratory in the US. The Gabbin Metakaolin, produced
by FLSmidth, was found to be of equivalent or superior quality to other marketavailable Metakaolin products (ASX Announcement: 28 April 2022).
The company is still investigating proprietary technology with Calix Limited (ASX
Announcement: 19 April 2022) to further reduce GHG emissions by utilising their
electric kiln technology which is powered by renewable energy.
Following the licensing agreement signed with Murdoch University earlier this week
for a geopolymer concrete batching plant and a low carbon concrete formulation –
‘Colliecrete’, the Company intends to commercialise the Murdoch Technology by
commencing studies to increase scale of the pilot plant to be able to produce
Colliecrete and other geopolymer concrete formulations, using Metakaolin, and
various readily available inputs such as other waste derived products like fly ash.
This initial laboratory trial using Suvo metakaolin has shown potential to
significantly reduce GHG emissions and achieve impressive strength, surpassing
many existing concrete applications.
Non-Executive Chairman Aaron Banks commented:
“This is an outstanding first round trial result for the Company which could provide
an entry into a large industry.
If the cement industry were a country, it would only be behind China and the United
States of America in CO2 emissions. The world use of cement is equivalent to
building New York City every 40 days.
The opportunity to play a part in reducing emissions in the cement industry is
analogous to the role of electric vehicles in replacing internal combustion engines
in the global passenger car fleet.
It’s the next round of testing that we look forward to most. We now expect to start
further testing with Pittong Kaolin and combining this with other mining companies
waste products such as fly ash and slag, that might otherwise be committed to
landfill, we will look to convert those waste streams into low carbon concrete.”
Associate Professor, Chair of Environmental Engineering of Murdoch University
Martin Anda commented:
“Because Australia largely ceased its own domestic production of Portland cement
and now imports much of the required clinker and lime, as well as completed
Portland cement, this could be a game changer for a new local industry and jobs.
Suvo Metakaolin exceeded expectations in the first round of trials achieving a
higher compressive strength than that which is required in most concrete
applications already.
We look forward to the next round of trials where we combine the Metakaolin with
other mining companies waste derived byproducts from their mineral processing to
further reduce the carbon footprint.”
Approved for release by the Board
-ENDS-
Test results
Identifier
Mass (g)
Density
(kg/m3)
Ave.
Diameter
Height
(mm)
Area
(mm2)
Load (N)
MPa
Ave. MPa
2*Std Dev
52.48
15.24
(mm)
SMK1.1
29.18
1508.42
24.71
40.35
479.42
21500
44.85
SMK1.2
29.99
1507.83
24.70
41.52
479.03
21040
43.92
SMK1.3
31.03
1564.73
24.69
41.42
478.78
28100
58.69
SMK1.4
28.16
1513.24
24.68
38.91
478.26
26300
54.99
SMK1.5
27.02
1510.19
24.69
37.38
478.65
28700
59.96
For further information, please contact
Aaron Banks
Non-Executive Chairman
E: aaron.banks@suvo.com.au
Company Profile
Suvo Strategic Minerals Limited is an Australian hydrous kaolin producer and exploration company listed on the
Australian Securities Exchange (ASX:SUV). Suvo is focused on production at, and expansion of, their 100% owned
Pittong hydrous kaolin operation located 40km west of Ballarat in Victoria. Suvo’s exploration focus is on near-term
kaolin and high purity silica assets with 100% owned Gabbin (kaolin), Eneabba and Muchea (silica sands) projects
located in Western Australia.
Pittong Operations
The 100% owned Pittong Operations, located in Victoria 40km west of Ballarat, is the sole wet kaolin mine and
processing plant in Australia and has been in operation since 1972. Pittong comprises the Pittong, Trawalla and Lal
Lal deposits located on approved Mining Licences MIN5408, MIN5365 and MIN5409 respectively.
At Pittong mining contractors deliver crude kaolin ore to stockpiles from the two currently operating mines, Pittong
and Lal Lal. The plant takes its feedstock from the ROM and it is processed into four separate product forms for end
users. These product forms are 10% moisture lump, high solids slurry, 1% moisture powder and 1% moisture
pulverised powder. The solids slurry is used in paper and board manufacturing. The other products are used in paper,
coatings, paint and specialist industries including rubber and pharmaceutical applications. Around 20-25kt per
annum is supplied to various end users.
Gabbin Kaolin Project
The 100% owned Gabbin Kaolin Project (White Cloud) is located 215km northeast of Perth, Western Australia. The
project area comprises four granted exploration licences (E70/5039, E70/5332, E70/5333, E70/5517) for 413km 2,
centred around the town and rail siding of Gabbin. The generally flat area is primarily cleared farming land devoid of
native bushland and is currently used for broad-acre cereal cropping. A mining access agreement is in place over the
current resource area with the landowner and occupier.
The main rock types at Gabbin are primarily Archaean granite, gneiss, and migmatite. These rocks are overlain and
obscured by Tertiary sand and Quaternary sheetwash. The weathering profile is very deep and contains thick kaolin
horizons capped by mottled clays or laterite zones. The current JORC 2012 Mineral Resources are 72.5Mt of bright
white kaolinised granite with an ISO Brightness of 80.5%.
Eneabba Silica Sands Project
The 100% owned Eneabba Silica Sands Project is located 300km north of Perth, Western Australia. The project
comprises four granted exploration licences (E70/5001, E70/5322, E70/5323, E70/5324) for 169km 2. The project
is located on the Eneabba Plain whose sandy cover is very flat to gently undulating. Outcrop is rare due to the
accumulations of windblown and alluvial sand at surface. Below this is a thin hard silcrete or lateritic claypan which
overlies deep white and yellow sands.