Investor Presentation
Released
Released
Announcement PDF
Developing Low-Cost,
Low-Carbon Cement
SEPTEMBER 2025
ASX:GT3
g360tech.au
G360tech.au
Disclaimer
These presentation materials and the accompanying verbal presentation (together, the Presentation Materials) are confidential and
have been prepared by Green 360 Technologies Limited. By receiving the Presentation Materials, you acknowledge and represent to
the Company that you have read, understood and accept the terms of this disclaimer. It is the responsibility of all recipients of
these Presentation Materials to obtain all necessary approvals to receive these Presentation Materials and receipt of the
Presentation Materials will be taken by the Company to constitute a representation and warranty that all relevant approvals have
been obtained.
NOT AN OFFER
These Presentation Materials are for information purposes only. The Presentation Materials do not comprise a prospectus, product
disclosure statement or other offering document under Australian law (and will not be lodged with the Australian Securities and
Investments Commission) or any other law.
The Presentation Materials also do not constitute or form part of any invitation, offer for sale or subscription or any solicitation for
any offer to buy or subscribe for any securities nor shall they or any part of them form the basis of or be relied upon in connection
there with or act as any inducement to enter into any contract or commitment with respect to securities. In particular, these
Presentation Materials do not constitute an offer to sell or a solicitation to buy securities in the United States of America.
NOT INVESTMENT ADVICE
The Presentation Materials are not investment or financial product advice (nor tax accounting or legal advice) and are not intended
to be used for the basis of making an investment decision. Recipients should obtain their own advice before making any investment
decision.
SUMMARY INFORMATION
The Presentation Materials do not purport to be all inclusive or to contain all information about the Company or any of the assets,
current or future of the Company. The Presentation Materials contain summary information about the Company and its activities
which is current as at the date the Presentation Materials. The information in the Presentation Materials is of a general nature and
does not purport to contain all information which a prospective investor may require in evaluating a possible investment in the
Company or that would be required in a prospectus or product disclosure statement or other offering document prepared in
accordance with the requirements of Australian law or the laws of any other jurisdiction, including the United States of America.
The Company does not undertake to provide any additional or updated information as a result of new information, future events to
results otherwise. Certain statements contained in the Presentation Materials, including information as to the future financial or
operating performance of the company and its projects are forward looking statements.
SUCH FORWARD LOOKING STATEMENTS;
a) Are necessarily based upon a number of estimated assumptions that, while considered reasonable by the Company,
are inherently subject to significant technical, business, economic, competitive, political and social uncertainties
and contingencies:
b) Involve known and unknown risks and uncertainties that could cause actual events or results to differ materially
from estimated or anticipated events or results reflected in such forward looking statements; and
c) May include, among other things, statements regarding estimates and assumptions in respect of prices, costs,
results and capital expenditure, and are or may be based on assumptions and estimates related to future technical,
economic, market, political, social and other conditions.
The Company disclaims any intent or obligation to publicly update any forward looking statements, whether as a result of
new information, future events or results or otherwise.
The words “believe”, “expect”, “anticipate”, ”indicate”, ”contemplate”, “target”, “plan”, “intends”, “continue”,
“budget”, “estimate”, “may”, “will”, “schedule”, and similar expressions identify forward looking statements.
All forward looking statements contained in the Presentation Materials are qualified by the foregoing cautionary
statements. Recipients are cautioned that forward looking statements are not guarantees of future performance and
accordingly recipients are cautioned not to put undue reliance on forward looking statements due to the inherent
uncertainty therein.
The Company has prepared the Presentation Materials based on information available to it at the time of preparation. No
representation or warranty, express or implied, is made as to the fairness, accuracy or completeness of the information,
opinions and conclusions contained in the Presentation Materials. To the maximum extent permitted by law, the
Company, its related bodies corporate (as that term is defined in the Corporations Act 2001 (Commonwealth of
Australia)) and the officers, directors, employees, advisers and agents of those entities do not accept any responsibility
or liability including, without limitation, any liability arising from fault or negligence on the part of any person, for any loss
arising from the use of the Presentation Materials or content otherwise arising in connection with it.
COMPETENT PERSON
The Presentation Materials contain references to the Company’s previous announcements, including announcements
dated 22 September 2021 and 27 September 2024. The Company confirms that it is not aware of any new information or
data that materially affects the information included in the relevant market announcements and that all material
assumptions and technical parameters underpinning the estimates and production targets in the relevant market
announcement continue to apply and have not materially changed.
G360tech.au
2
Highlights
An Australian Building Materials Company Leading the Development of Low-Carbon
Cement Solutions, Nationwide
Urgent Market Demand
Driven by Government
Policy
First Mover Advantage
Low-Cost, LowCarbon Footprint Solution
Two Vertical Supply
Chains, National
Solution
Revenue
Generation
Australia’s Safeguard
Mechanism requires the
highest carbon emitters
including cement producers
to reduce emissions to
reduction targets of 43%
below 2005 levels by 2030
and net zero by 20501
Australia’s first producer of
Kaolin (MetaKaolin) used in a
simple “Drop in Solution” to
produce a low-cost, lowcarbon cement alternative,
that delivers superior
performance and a reduced
environmental footprint
Two vertical supply chains,
national solution, executing a
commercialisation plan with
reputable market leaders to
drive near-term adoption of
low-carbon cement – with
product already in market and
nationwide supply capability
Revenue positive business
with established blue chip
customer base for Kaolin high
margin products
1.
DCCEEW, Safeguard Mechanism
Revenue stream and strong
financial foundation,
supporting development of
Low Carbon cement
G360tech.au
3
Corporate Overview
1,156.4m
154.8m
$0.032
$37m
~$4m
Shares on
Issue
Options &
Performance Rights
Share Price
(as at 2 September 2025)
Market
Capitalisation
Cash at Bank
(August 2025)
Low Carbon Cement National Solution via
Two Vertical Supply Chains
Capital Structure
NT
50%
50%
Top 40 including
Management
WA
QLD
Gabbin
Others
Supply VIC, NSW & SA
SA
NSW
Supply WA
JORC Mineral Resource Estimate
72.5MT of Kaolinised Granite
1.
Refer to Appendix 1
18Mt total of Inferred and Indicated
JORC Kaolin Resources1
Pittong
VIC
G360tech.au
4
Australia’s First Producer of Kaolin
First mover advantage for Metakaolin
Green360’s low-carbon cement is an alternative and partial
replacement for the traditional cement binder in concrete,
therefore reducing emissions
Green360’s formulations use industrial by-products and Metakaolin as key inputs to
create a low-carbon cement, rather than the traditional Portland cement production
process
These key inputs have lower emission profiles than traditional cement, displacing the
key polluter in the concrete production
Low-Carbon Cement
Replaces Cement in Concrete
Concrete with
Reduced Emissions
G360tech.au
5
Cement and Concrete
Cement and concrete are essential
building materials for modern
construction
Coarse Aggregate
Sand
Cement
Concrete
Traditional primary binder in concrete,
produced through an energy-intensive, highemissions process
Durable construction material that hardens
over time, made from cement, coarse
aggregate, sand and water
Water
Cement
Concrete
G360tech.au
6
Global Market for Cement and Concrete
USD$972.0b
Cement and concrete are markets of massive scale,
with rapid growth forecasted
Market Size
USD$617.3b
USD$407.4b
CAGR ~4.7%
2020
Global cement and concrete markets are larger than the global lithium, copper and
iron ore markets3
2030
Global Concrete Market Forecast1
4.0 Billion Tonnes
USD$673.8b
Cement production equates to 4 billion tonnes annually, with demand expected to
grow to 5 billion tonnes in the next decade4
2nd Most Consumed Resource
Concrete is the most widely used man-made product in the world and is second
only to water as the worlds most consumed resource5
USD$407.4b
USD$407.4b
CAGR ~5.2%
2024
2033
Global Cement Market Forecast2
1.
2.
3.
4.
5.
https://www.alliedmarketresearch.com/concrete-market-A12420
IMARC Cement Market Size, Share, Trends and Forecast by Type, End Use, and Region, 2025-2033
Grand View Research, Mordor Intelligence Reports
https://www.chathamhouse.org/2018/06/making-concrete-change-innovation-low-carbon-cement-and-concrete
World Cement Association
G360tech.au
7
The Problem – Traditional Cement is a Polluter
Worldwide production of cement results in 3.2 billion tonnes of CO2 per year,
representing 8% of global emissions1
Production
Process
Mining and grinding of
raw material to a powder
CO2
Generation
~5%
1.
Mining and grinding
Powder is heated in a kiln
to make clinker
~90%
Burning Limestone using
fossil fuels
https://www.chathamhouse.org/2018/06/making-concrete-change-innovation-low-carbon-cement-and-concrete
Clinker is ground with
gypsum to create
cement
Cement is mixed with
other inputs to create
concrete
~0%
~5%
Mixing with gypsum
Transportation/logistics
G360tech.au
8
Significant Market
Opportunity
Safeguard Mechanism
The Australian government has set annual emissions limits on industrial facilities,
including those in concrete and cement, requiring a reduction in emissions year-on-year
to 20301
Strained Domestic Supply
Australia has experienced impactful closures of cement plants in recent years, causing
local production shortages and necessitating imports of cement clinker from countries
including Indonesia, Japan, Thailand, Vietnam and Singapore to fill the gap in the market2
Low-Carbon, Low-Cost Cement Solution
Low-Carbon, Green
Alternative
Significantly lower
CO2 emissions than
traditional cement
1.
2.
DCCEEW, Safeguard Mechanism
https://oec.world/en/profile/bilateral-product/cement/reporter/aus
Delivering Cost
Efficiency
Utilising cost-effective key
input materials to deliver a
product at a competitive
price
Repurposing
Waste
Uses industrial byproducts contributing to
the recycling of waste
materials
Utilising
Kaolin
Incorporating high purity
calcined kaolin (Metakaolin)
to improve the performance
of concrete products
G360tech.au
9
A Low-Carbon, Low-Cost Concrete Innovation
WESTERN AUSTRALIA
Transforming High Purity Kaolin and Industrial By-Product into a Sustainable Solution
Industrial ByProducts
Metakaolin
Turning Industrial Waste into Revenue
3 Industrial By-Products
Reducing emissions, developing a commercial product &
solving industrial waste challenges
Lithium hydroxide, red mud, nickel slag
Green360
Technology Process
Low-Carbon Cement
Replaces Cement in Pre Cast Concrete
Products with Reduced Emissions
VICTORIA
Calciner
High Purity
Kaolin
Metakaolin
Low-Carbon Cement
Replaces Cement in Concrete
Products with Reduced Emissions
G360tech.au
10
Pathway to Suppling East Coast Markets
STAGE 1
450t Metakaolin
Produced via Toll
Treatment for
Low-Carbon Cement
Metakaolin to replace
Portland cement has been
made available to the
Victorian government to trial
in major infrastructure
projects1
STAGE 2
Scale-up Metakaolin
Production at Pittong
Discussions with commercial
partners including major
concrete end users
STAGE 3
Potential for largescale Metakaolin
Production at
Trawalla
Capability to supply low
carbon concrete to VIC,
NSW & SA
Third party toll treatment
facilities for immediate
supply to market currently
being negotiated
1.
https://investorhub.g360tech.au/announcements/7048455
G360tech.au
Pittong Kaolin Operation
Australia’s only wet kaolin processing facility operating
since 1972, located 40km west of Ballarat in Victoria
Multi-decade mine life
Combined with the Trawalla Deposit, supported by over 18Mt total of Inferred and
Indicated JORC Compliant Kaolin Resources1
Revenue generating asset
$13.3m (unaudited) revenue generated in FY25 from the sale of circa 22kt of product,2
with recent plant upgrades allowing for scale up to 60kt per annum3 and strategic
customer engagement to offtake additional product
Established customer base
Established sales contracts with recognisable brands, supplying into premium, highmargin industries, including Dulux, Sherwin Williams, Nippon Paint, and Estee Lauder
VERTICALLY INTEGRATED
BUSINESS
1.
2.
3.
Refer to Appendix 1 and Annual Report lodged with the ASX on 27 September 2024
https://investorhub.g360tech.au/announcements/7078594
As announced on 6 February 2023
High purity Kaolin is a key input in Green360’s lowcarbon cement formulations allowing for further
facility growth and expansion
G360tech.au
12
Pathway to Supplying Western Australia
STAGE 1
Joint Venture with
PERMAcast
Partnered with WA’s leading
supplier of precast concrete
products1
1.
2.
3.
https://investorhub.g360tech.au/announcements/6594323
https://investorhub.g360tech.au/announcements/6978984
https://investorhub.g360tech.au/announcements/6488319
STAGE 2
STAGE 3
Metakaolin +
Industrial By-Product
to make precast
concrete
Validated lowcarbon cement in
precast concrete
products
Low-carbon cement
formulations are rolled out into
precast concrete products via
PERMAcast to test for strength,
workability, durability, slump,
and other relevant factors2
Validating Green360’s lowcarbon cement with
PERMAcast precast
products — paving the way
for large-scale bagged
cement production3
G360tech.au
White Cloud Kaolin Project
100% owned - 215km northeast of Perth, WA
Strategic Location with Rail Access
Low Impact, High Potential
Large-Scale, High-Quality Kaolin Resource
The project area comprises of one granted
exploration licence centred around the town and rail
siding of Gabbin
Located on cleared farming land with minimal
environmental constraints, the Project has a
mining access agreement in place, supporting a
clear pathway to development
The Project hosts a JORC 2012 Mineral Resource of
72.5Mt of bright white kaolinised granite with strong
ISO Brightness (80.5%) and a 41.2% <45μm yield,
delivering 29.9Mt of contained kaolin1
1.
https://investorhub.g360tech.au/announcements/3958164
G360tech.au
14
Key Activities and Milestones
Q3 CY2025
Q4 CY2025
Q1 CY2026
Low-Carbon Cement Development
Commercial scale production trials VICTORIA
Calcined clay-based formulation development and testing
Life cycle analysis
Financial studies and key input material sourcing
Product Validation and Market Adoption
First commercial sales and delivery of a low-carbon products
Testing of industrial by-products and execution of supply agreements
Financial studies, guidance forecasts and key input supply agreements
Kaolin Operations
Product quality verification tests completed and new sales
Product development and trials in new markets (i.e. animal feed)
Continuous processing improvements and cost reduction
G360tech.au
15
Investment Summary
A scalable, low-cost, low-carbon cement solution underpinned by revenue-generating kaolin operations
Urgent Market Demand
Low-Carbon, Low-Cost
Solution
Cement and concrete industries facing
emission reduction requirements under the
Safeguard Mechanism and supply shortages
An innovative process using calcined kaolin
and industrial by-products to partially replace
traditional cement in concrete
Pittong Kaolin facility in Victoria: multi-decade
mine life, 18Mt JORC resource1, $13.3M FY25
revenue (unaudited), supplying into premium
industries with established blue-chip
customers
Pathway to Market
Revenue Generation
Nationwide Solution
Existing kaolin revenues + future growth
through low-carbon cement and industrial byproduct partnerships
Strategically positioned to scale nationally,
with two vertical supply chains in Western
Australia and Victoria (to supply VIC, NSW, SA)
- Western Australia: JV with PERMAcast
validates low-carbon cement in precast
products, paving the way for commercial
bagged cement production.
Proven Kaolin Operations
- Eastern Australia: First revenues from toll
treatment (450t Metakaolin supplied to Vic
Gov. for infrastructure2). Next steps: Scale-up
for Pittong, followed by potential large-scale
production at Trawalla.
1.
2.
Refer to Appendix 1
https://investorhub.g360tech.au/announcements/7048455
G360tech.au
16
Contact
REGISTERED OFFICE
Green360 Technologies Limited
Level 11, 40 The Esplanade
Perth, WA 6000
Australia
FURTHER INFORMATION
Aaron Banks – Executive Chairman
EMAIL
info@g360tech.au
ASX:GT3
g360tech.au
Appendix
G360tech.au
18
Appendix 1
Kaolin Mineral Resources Statement - as at 30 June 2024
Category
White Kaolinised Granite (Mt)
ISO Brightness % (457nm)
Yield <45um %
Kaolin (Mt)
Indicated
26.9
80.4
41.3
11.1
Inferred
45.6
80.6
41.1
18.8
Total
72.5
80.5
41.2
29.9
Indicated
9.9
81.0
27.7
2.8
Inferred
2.8
79.8
28.3
0.8
Total
12.7
80.8
27.8
3.6
Indicated
3.6
81.3
35.5
1.3
Inferred
1.9
79.1
33.0
0.7
Total
5.5
80.5
34.6
2.0
Gabbin Project (White Cloud Kaolin Project)
Trawalla Resource
Pittong Resource
Information on the Mineral Resources presented is contained in the ASX announcement dated 27 September 2024. Green360 confirms that it is not aware of any information or data that materially affects the information included in this announcement and that all material
assumptions and technical parameters underpinning the estimates continue to apply and have not materially changed. The Company confirms that the form and context in which the Competent Person’s findings are presented have not been materially modified from the
original market announcements.
G360tech.au
Appendix 2
Wind with Purpose MOU
The Joint Venture between Green360 and PERMAcast is
granted a first right of refusal to supply low carbon concrete
for Wind with Purpose (WWP) large-scale projects1
Onshore and offshore energy development
WWP is engaged in the potential development of large-scale onshore and offshore wind energy
projects in Western Australia
Significant construction requirement
WWP plans to install approx. 3 gigawatts of onshore wind and 2 gigawatts of offshore wind
capacity, which would require the construction of between 400-500 wind turbines1
Potential revenue stream
Volume of concrete required per foundation for an onshore wind turbine can exceed 1,000 cubic
metres,2 with the current commercial value of concrete being roughly $300 per cubic meter
1.
2.
Refer to Announcement 26 February 2025
https://www.cte-wind.com/
G360tech.au
20
Joint Venture with PERMAcast
Partnered with WA’s leading supplier of precast
concrete products to validate our low-carbon
cement formulations
Access to target market to validate product
Working with PERMAcast allows Green360 to validate the Company’s low-carbon cement
in pre-cast concrete products with local WA customers
Leading, reputable supplier
Supplied concrete to major projects such as Chevron’s Gorgon Gas Project, Perth Optus
Stadium, Elizabeth Quay, BHP’s Jimblebar Iron Ore Project and the Mitchell Fwy
Expansion
Precast concrete facility
PERMAcast has employed up to approx. 400 people, with in-house precast concrete
manufacturing capabilities
G360tech.au
21
Validating with Customers
Testing low-carbon cement in
commoditised concrete products
Produced Low-Carbon Concrete for Government Project
Green360 has worked with PERMAcast to produce and deliver concrete blocks
made with Green360’s low-carbon cement to a major WA Government project, a
significant step towards validating the Company’s formulations
Positive results
28-day strength tests conducted on concrete blocks produced with Green360
low-carbon cement achieved up to 35 megapascals, exceeding the strength
requirements of their end-use applications,1 and providing the project with a
significantly reduced emissions profile
Next steps
Green360 and PERMAcast JV is currently in the process of quoting jobs to supply
other concrete products made with low-carbon cement to market
1.
https://investorhub.g360tech.au/announcements/6488319
Concrete blocks made with Green360 low-carbon cement
G360tech.au
22
Share your feedback
Discover