Quarterly Activities/Appendix 5B Cash Flow Report
Released
Released
Announcement PDF
ASX ANNOUNCEMENT
QUARTERLY ACTIVITIES REPORT
24 January 2024
For the quarter ended 31 December 2023
HIGHLIGHTS
•
Revenue of A$3.0 million generated during the quarter from the sale of
5,119 tonnes of hydrous kaolin, averaging 1,706 tonnes per month.
•
Growth in sales of 14% achieved when compared to FY23 monthly average of
~1,500 tonnes per month.
•
Purchase order for an additional 250 tonnes per annum received with
deliveries commencing in February 2024. Product attracts a 13% price
premium compared to the average selling price, earmarked for the domestic
plasterboard industry.
•
Over 20 end users throughout Asia Pacific continue to test Suvo product
samples from the Company’s hydrous kaolin Pittong operation. Samples have
now passed quality and performance tests by some of the end users.
•
Prepayments for hydrous kaolin totaling A$0.50 million and US$0.43 million
were received from two of the Company’s customers.
•
Debt funding of A$1.0 million (before costs) received. Terms include 10%
interest with funding secured against the Company’s non-core asset and
repayable in 12 months.
•
Exclusive Intellectual Property License Agreement signed with Murdoch
University for a pilot scale geopolymer concrete batching plant and a low
carbon concrete formulation – ‘Colliecrete’.
•
Suvo formally invited to complete demonstration pour of Colliecrete on
sections of the Bunbury Outer Ring Road Project, the largest road
infrastructure project in the history of the South-West in Western Australia.
•
Two lab-scale geopolymer concrete formulations created using solely
metakaolin and a metakaolin and fly-ash mix. Both provided promising
results.
Aaron Banks
NON-EXECUTIVE CHAIRMAN
Oliver Barnes
NON-EXECUTIVE DIRECTOR
Agu Kantsler
NON-EXECUTIVE DIRECTOR
Suvo Strategic Minerals Ltd. ABN 97 140 316 463
Head Office: Level 11, 40 The Esplanade, Perth, Western Australia 6000
Operations: 3610 Glenelg Highway, Pittong, Victoria 3360
Suvo Strategic Minerals Limited (ASX: SUV) (“Suvo” or “the Company”) is pleased to
release its December 2023 Quarterly Report.
Sales and marketing, Pittong operations
During the quarter, the Company generated A$3.0 million from the sale of 5,119
tonnes of hydrous kaolin, averaging 1,706 tonnes per month and attracting a
weighted average selling price of ~A$590/tonne.
This represents growth in sales of 14% when compared to monthly averages achieved
in FY23 of ~1,500 tonnes per month.
In addition, a purchase order has been received from a local plasterboard
manufacturer after Pittong hydrous kaolin successfully passed performance tests
through plant trials. Deliveries will commence in February 2024 with an annual
requirement of 250 tonnes. A price premium of 13% was achieved, compared to the
weighted average selling price achieved during the quarter.
Over 20 potential end users throughout Asia Pacific continue the testing of Suvo
product samples from the Company’s hydrous kaolin Pittong operation, supplied
during H2 CY 2023. For some of these end users, product samples have successfully
passed quality and performance tests and the Company is working to negotiate
potential purchase orders and sales contracts with these end users.
More recently, several potential new customers, in addition to the customers
approached during H2 CY 2023, have been identified throughout Asia by the
Company’s new sales team, and Pittong hydrous kaolin samples have been
distributed to these companies for testing. Management remains confident there are
a number of opportunities for near-term sales to these targeted end users.
Following significant demand from the Company’s existing Asia Pacific customers
and distributors, Suvo engaged German thermal processing specialists IBU-tec
Advanced Materials AG (“IBU-tec”), to complete laboratory (“lab”) scale testing
utilising the Company’s Pittong hydrous kaolin with the aim of successfully producing
calcined kaolin.
The Company’s existing Pittong hydrous kaolin customers in Australia, , currently
import ~10,000 tonnes per annum of calcined kaolin. The market in Asia is
significantly larger with consumption in the hundreds of thousands of tonnes.
The lab scale trials, using an electrically heated muffle furnace and Pittong hydrous
kaolin as the material, will run at different temperatures and residence times to
produce the optimal calcined kaolin reference sample.
Subject to successful results from the lab scale trial, upscaling and production of a
25kg batch sample is planned which would allow Suvo to distribute 1kg samples to
customers for testing and product evaluation. The Company expects to complete
lab scale test works by the end of Q1 CY 2024 and, if successful, product samples
can then be distributed to potential end users.
In addition, the Company commenced lab scale trials at its Pittong laboratory,
utilising the Company’s Pittong hydrous kaolin and blending it with Ground Calcium
Carbonate (“GCC”), with the aim of increasing a new saleable product from Pittong
beyond the plant’s 50,000 tonne per annum production capacity.
The Pittong lab team will commence lab scale trials by blending 10%, 20% and 30%
GCC with Pittong’s hydrous kaolin. The potential increase in saleable product, based
on the various blends is shown in the table below:
Pittong production
10% blend with GCC
20% blend with GCC
30% blend with GCC
tonnes per annum1
Additional saleable
Additional saleable
Additional saleable
10,000
1,000
2,000
3,000
20,000
2,000
4,000
6,000
30,000
3,000
6,000
9,000
40,000
4,000
8,000
12,000
50,000
5,000
10,000
15,000
quantity blended
product in tonnes
product in tonnes
product in tonnes
The GCC import price to Melbourne port is ~US95/ tonne which is significantly less
than the cost of production for Pittong hydrous kaolin. Importantly, this product
development opportunity not only has the potential to increase saleable product,
but also to reduce production costs.
The Company expects to complete lab scale test works and distribute product
samples to end users by the end of Q1 CY 2024.
Capital works at the Pittong plant have reduced significantly. During the quarter
A$0.2 million was spent on plant improvements and A$0.1 million spent on
overburden stripping to allow for mining activities. No material capital projects are
planned in the near-term, thus minimizing capital outlay.
Funding
During the quarter, the Company secured additional non-dilutive working capital
funding of circa A$2.18 million (before costs) through debt and product
prepayments.
The Company had sought a working capital funding solution to support operational
costs to meet sales orders and the emerging strategy of controlled, high-margin
growth through product development, such as the test work to produce calcined
kaolin and a GCC product blend to increase the saleable product from the Pittong
operations.
The debt funding of A$1 million provided by a private lender, Tember Nominees Pty
Ltd, is on favorable terms with an interest rate of 10% and repayable in 12 months.
The Company used a non-core asset, being freehold land, it owns at Lal Lal, located
in Victoria, as security against the loan.
In addition to the debt funding, the Company also received prepayments of US$0.43
million (~A$0.68 million) from ChaoZhou Cheng Cheng Industrial Co.,Ltd and A$0.50
million from Tasmania customer, Norske Skog Boyer.
Executive and Board change
During the quarter, the Company’s CFO, Bojan Bogunovic, was appointed as Interim
CEO of the Company, following the resignation of Mr. Hugh Thomas as Managing
Director and CEO.
Mr. Bogunovic joined the Company as Group Financial Controller in July 2021,
shortly after the acquisition of the Pittong Operations from French multinational
Imerys S.A. In October 2021, he was promoted from Group Financial Controller to
Chief Financial Officer. Over a period of 4 months and prior to his appointment as
interim CEO of the Company, Bojan was acting in a joint capacity as CFO and Chief
Commercial Officer (“CCO”), focusing on the sale and marketing of Suvo’s hydrous
kaolin throughout the Asia Pacific.
Additionally, Aaron Banks transitioned from Interim Non-Executive Chairman to
Non-Executive Chairman.
Projects
Geopolymer concrete
In October 2023, Suvo entered into an exclusive Intellectual Property License
Agreement with Murdoch University to license and commercialise the ‘Murdoch
Technology’ namely, Intellectual Property for a pilot scale geopolymer concrete
batching plant and a low carbon concrete formulation known as ‘Colliecrete’.
Geopolymer concrete is a low carbon concrete that is made by reacting aluminate
and silicate bearing materials with a caustic activator, such as metakaolin, flyash,
ground blast furnace slag and other waste derived materials. It is a suitable
replacement to the traditional binder known as Ordinary Portland Cement (“OPC”).
Concrete is the most consumed product on the planet behind filtered water. The
manufacture of OPC (the binder necessary to make concrete) is an highly CO2
emitting process – equivalent to the entire global car fleet. For every tonne of OPC
produced, roughly 1 tonne of CO2 is produced.
A small pilot plant has been built by Murdoch University in the town of Collie,
approximately 200kms southeast of Perth, where various geopolymer concrete
trials have been conducted over the last 6 months.
The purpose of the pilot plant is to produce a low carbon concrete, with zero OPC,
as an alternative building material to concrete produced with OPC. Using the
Murdoch Technology, various pre-cast products have been produced, including
retaining wall blocks, wall panels and aprons. Preliminary results from the trials, as
reported by Murdoch, indicate a greenhouse gas emissions reduction of
approximately 50% compared to concrete using ordinary cement.
More recently, subsequent to the quarter end, Suvo has been invited by the
Sustainability Waste Alliance (SWA) to complete a demonstration pour of Colliecrete,
on sections on the Bunbury Outer Ring Road Project (BORR), the largest road
infrastructure project in the history of the South-West in Western Australia.
The SWA was established to identify additional specific opportunities for using
greener, low carbon and recycled materials in upcoming major transport
infrastructure projects being facilitated by the WA Governments Office of Major
Transport Infrastructure Delivery, such as the Bunbury Outer Ring Road. If
successful, the demonstration pour may present the opportunity to use Colliecrete
on other government infrastructure projects.
As a result, Suvo plans to initiate studies for commercial scale up of the pilot
batching plant, which currently can produce 2 cubic meters per hour, enabling
commercial scale production of Colliecrete and other geopolymer concrete
formulations, incorporating metakaolin and various waste-derived materials such as
fly ash.
Recently, the Company has created two lab scale geopolymer concrete formulations
using metakaolin and fly-ash, a waste derived material, with promising results for
both emission reductions and compressive strength tests. The geopolymer
formulation using the Company’s metakaolin returned an average strength test of
52MPa, surpassing the strength of many traditional concrete applications.
Dingo HPA
In August 2023, prior to the current quarter, the Company provided an update on
its announcement of 25 November 2022 in respect of Suvo’s acquisition of a 26%
share in Dingo HPA Pty Ltd (“Dingo”) and entry into a staged earn-in agreement
(“Agreement”).
Under the terms of the Agreement, Suvo had rights to acquire up to a 76% interest
in Dingo through the satisfaction of various milestone obligations.
Suvo and Dingo mutually agreed not to progress the remaining stages of the
Agreement, and as a result, Suvo agreed to sell its 26% share at an agreed price of
A$175,000. The Company and Dingo are still working through the divestment
process, which was previously expected to be completed by 31 December 2023.
Disclosure Requirements (Guidance Note 23 Disclosures)
Details of mining exploration activities:
The A$0.06 million of exploration and evaluation expenditure was largely attributable
to land access fees, tenement rates and rents and tenement management.
Details of mining production and development activities:
The Company spent A$2.83 million on production costs and A$0.32 million on
development activities during the quarter ended 31 December 2023.
Details of tenement activities:
The Company holds the following tenements at the end of the quarter:
TENEMENT
PROJECT
OWNERSHIP
CHANGE
E70/5332
Gabbin Kaolin
100%
Nil
E70/5039
E70/5333
E70/5517
E70/5324
E70/5001
E70/5322
E70/5323
M5408
M5409
Gabbin Kaolin
Gabbin Kaolin
Gabbin Kaolin
Eneabba Silica Sand
Eneabba Silica Sand
Eneabba Silica Sand
Eneabba Silica Sand
Pittong Kaolin
Trawalla Kaolin
M5365
Lal Lal Kaolin
E = Exploration License (granted)
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
M = Mining Lease (granted)
Nil
Nil
Nil
Nil
Nil
Nil
Nil
Nil
Nil
Nil
Details of related party payments:
During the quarter the Company paid A$0.11 million to Directors for Salaries and
Wages.
Approved for release by the Board
-ENDSFor further information, please contact
Aaron Banks
Non-Executive Chairman
E: aaron.banks@suvo.com.au
Company Profile
Suvo Strategic Minerals Limited is an Australian hydrous kaolin producer and exploration company listed on the
Australian Securities Exchange (ASX:SUV). Suvo is focused on production at, and expansion of, their 100% owned
Pittong hydrous kaolin operation located 40km west of Ballarat in Victoria. Suvo’s exploration focus is on near-term
kaolin and high purity silica assets with 100% owned Gabbin (kaolin), Eneabba and Muchea (silica sands) projects
located in Western Australia.
Pittong Operations
The 100% owned Pittong Operation, located in Victoria 40km west of Ballarat, is the sole wet kaolin mine and
processing plant in Australia and has been in operation since 1972. Pittong comprises the Pittong, Trawalla and Lal
Lal deposits located on approved Mining Licences MIN5408, MIN5365 and MIN5409 respectively.
At Pittong, mining contractors deliver crude kaolin ore to stockpiles from the two currently operating mines, Pittong
and Lal Lal. The feedstock is processed into four separate products for end users. These products are 10% moisture
lump, high solids slurry, 1% moisture powder and 1% moisture pulverised powder. The solids slurry is used in paper
and board manufacturing. The other products are used in paper, coatings, paint and specialist industries including
rubber and pharmaceutical applications. Around 20-25kt per annum is supplied to various end users.
Gabbin Kaolin Project
The 100% owned Gabbin Kaolin Project (White Cloud) is located 215km northeast of Perth, Western Australia. The
project area comprises four granted exploration licences (E70/5039, E70/5332, E70/5333, E70/5517) totalling
413km2, centred around the town and rail siding of Gabbin. The generally flat area is primarily cleared farming land
devoid of native bushland and is currently used for broad-acre cereal cropping. A mining access agreement is in
place over the current resource area with the landowner and occupier.
The main rock types at Gabbin are primarily Archaean granite, gneiss, and migmatite. These rocks are overlain and
obscured by Tertiary sand and Quaternary sheetwash. The weathering profile is very deep and contains thick kaolin
horizons capped by mottled clays or laterite zones. The current JORC 2012 Mineral Resources are 72.5Mt of bright
white kaolinised granite with an ISO Brightness of 80.5%.
Eneabba Silica Sands Project
The 100% owned Eneabba Silica Sands Project is located 300km north of Perth, Western Australia. The project
comprises four granted exploration licences (E70/5001, E70/5322, E70/5323, E70/5324) totalling 169km2. The
project is located on the Eneabba Plain where the sandy cover is very flat to gently undulating. Outcrop is rare due to
the accumulations of windblown and alluvial sand at surface. Below this is a thin hard silcrete or lateritic claypan
which overlies deep white and yellow sands.
ASX CHAPTER 5 COMPLIANCE AND CAUTIONARY AND FORWARD-LOOKING STATEMENTS
ASX Listing Rules 5.19 and 5.23
ASX Listing Rule 5.19
The information in this announcement relating to production targets, or forecast financial information derived from
a production target, is extracted from the announcement entitled ‘Pittong Plant Upgrade & Optimisation & Production
Guidance’ released to the ASX on 26 August 2022 which is available on the Company's website www.suvo.com.au.
The Company confirms that all material assumptions underpinning the production target, or the forecast financial
information derived from a production target, in the original market announcement continue to apply and have not
materially changed.
ASX Listing Rule 5.23
The information in this announcement relating to exploration results and mineral resource estimates for the
Company’s Projects has been extracted from the following announcements:
Pittong Maiden Mineral Resource Estimate, ASX Announcement dated 1 March 2022,
Maiden Nova Mineral Resource Estimate, ASX Announcement dated 12 October 2021,
Trawalla Maiden Mineral Resource Estimate, ASX Announcement dated 22 September 2021,
Suvo increases White Cloud kaolin resource by 84% to 72.5Mt of bright white kaolinised granite, ASX Announcement
dated 25 March 2021,
which are all available on the Company's website www.suvo.com.au.
The Company confirms that it is not aware of any new information or data that materially affects the information
included in the original market announcement, and that all material assumptions and technical parameters
underpinning the estimates in the original market announcement continue to apply and have not materially changed.
The Company confirms that the form and context in which the competent person's findings are presented have not
been materially modified from the original market announcement.
Forward-Looking Statements
This release may contain certain forward-looking statements with respect to matters including but not limited to the
financial condition, results of operations and business of SUV and certain of the plans and objectives of SUV with
respect to these items.
These forward-looking statements are not historical facts but rather are based on SUV’s current expectations,
estimates and projections about the industry in which SUV operates and its beliefs and assumptions.
Words such as "anticipates," “considers,” "expects," "intends," "plans," "believes," "seeks," "estimates", "guidance" and
similar expressions are intended to identify forward looking statements and should be considered an at-risk
statement. Such statements are subject to certain risks and uncertainties, particularly those risks or uncertainties
inherent in the industry in which SUV operates.
These statements are not guarantees of future performance and are subject to known and unknown risks,
uncertainties, and other factors, some of which are beyond the control of SUV, are difficult to predict and could cause
actual results to differ materially from those expressed or forecasted in the forward-looking statements. Such risks
include, but are not limited to resource risk, product price volatility, currency fluctuations, increased production costs
and variances in product grade or recovery rates from those assumed in mining plans, as well as political and
operational risks in the countries and states in which we sell our product to, and government regulation and judicial
outcomes. For more detailed discussion of such risks and other factors, see the Company’s Annual Reports, as well
as the Company’s other filings.
SUV cautions shareholders and prospective shareholders not to place undue reliance on these forward-looking
statements, which reflect the view of SUV only as of the date of this release.
The forward-looking statements made in this announcement relate only to events as of the date on which the
statements are made.
SUV will not undertake any obligation to release publicly any revisions or updates to these forward-looking
statements to reflect events, circumstances or unanticipated events occurring after the date of this announcement
except as required by law or by any appropriate regulatory authority.
Rule 5.5
Appendix 5B
Mining exploration entity or oil and gas exploration entity
quarterly cash flow report
Name of entity
Suvo Strategic Minerals Limited
ABN
Quarter ended (“current quarter”)
97 140 316 463
31 December 2023
Consolidated statement of cash flows
Current quarter
$A’000
Year to date (6
months)
$A’000
3,744
6,788
(a) exploration & evaluation
-
-
(b) development
-
-
(c) production
(2,829)
(5,412)
(d) staff costs
(385)
(772)
(e) administration and corporate costs
(724)
(1,356)
-
-
12
27
(125)
(152)
1.
Cash flows from operating activities
1.1
Receipts from customers
1.2
Payments for
1.3
Dividends received (see note 3)
1.4
Interest received
1.5
Interest and other costs of finance paid
1.6
Income taxes paid
-
-
1.7
Government grants and tax incentives
-
21
1.8
Other (income tax refunds)
-
-
1.9
Net cash from / (used in) operating
activities
(307)
(856)
2.
Cash flows from investing activities
2.1
Payments to acquire or for:
(a) entities
-
-
(b) tenements
-
-
(c) property, plant and equipment
(210)
(618)
(d) exploration & evaluation
(57)
(123)
-
-
(109)
(141)
(e) investments
(f)
other non-current assets
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 1
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
Consolidated statement of cash flows
2.2
Current quarter
$A’000
Year to date (6
months)
$A’000
Proceeds from the disposal of:
(a) entities
-
-
(b) tenements
-
-
(c) property, plant and equipment
-
-
(d) investments
-
-
(e) other non-current assets
-
-
2.3
Cash flows from loans to other entities
-
-
2.4
Dividends received (see note 3)
-
-
2.5
Other
-
-
2.6
Net cash from / (used in) investing
activities
(376)
(882)
3.
Cash flows from financing activities
3.1
Proceeds from issues of equity securities
(excluding convertible debt securities)
-
-
3.2
Proceeds from issue of convertible debt
securities
-
-
3.3
Proceeds from exercise of options
-
7
3.4
Transaction costs related to issues of equity
securities or convertible debt securities
-
(15)
3.5
Proceeds from borrowings
1,000
1,000
3.6
Repayment of borrowings
(267)
(464)
3.7
Transaction costs related to loans and
borrowings
-
-
3.8
Dividends paid
-
-
3.9
Other (repayment of lease liabilities)
(88)
(175)
3.10
Net cash from / (used in) financing
activities
645
353
4.
Net increase / (decrease) in cash and
cash equivalents for the period
4.1
Cash and cash equivalents at beginning of
period
1,817
3,164
4.2
Net cash from / (used in) operating
activities (item 1.9 above)
(307)
(856)
4.3
Net cash from / (used in) investing activities
(item 2.6 above)
(376)
(882)
4.4
Net cash from / (used in) financing activities
(item 3.10 above)
645
353
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 2
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
Consolidated statement of cash flows
4.5
Effect of movement in exchange rates on
cash held
4.6
Cash and cash equivalents at end of
period
5.
Reconciliation of cash and cash
equivalents
Current quarter
$A’000
Year to date (6
months)
$A’000
-
-
1,779
1,779
Current quarter
$A’000
Previous quarter
$A’000
at the end of the quarter (as shown in the
consolidated statement of cash flows) to the
related items in the accounts
5.1
Bank balances
1,779
1,817
5.2
Call deposits
-
-
5.3
Bank overdrafts
-
-
5.4
Other (cash held in term deposit)
-
-
5.5
Cash and cash equivalents at end of
quarter (should equal item 4.6 above)
1,779
1,817
6.
Payments to related parties of the entity and their
associates
6.1
Aggregate amount of payments to related parties and their
associates included in item 1
112
6.2
Aggregate amount of payments to related parties and their
associates included in item 2
-
Current quarter
$A'000
Note: if any amounts are shown in items 6.1 or 6.2, your quarterly activity report must include a description of, and an
explanation for, such payments.
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 3
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
7.
Financing facilities
Note: the term “facility’ includes all forms of financing
arrangements available to the entity.
Add notes as necessary for an understanding of the
sources of finance available to the entity.
Total facility
amount at quarter
end
$A’000
Amount drawn at
quarter end
$A’000
7.1
Loan facilities
-
-
7.2
Credit standby arrangements
-
-
7.3
Other (equipment finance facility)
1,000
674
7.4
Total financing facilities
1,000
674
-
7.5
Unused financing facilities available at quarter end
326
7.6
Include in the box below a description of each facility above, including the lender, interest
rate, maturity date and whether it is secured or unsecured. If any additional financing
facilities have been entered into or are proposed to be entered into after quarter end,
include a note providing details of those facilities as well.
The facility is an equipment finance facility provided by National Australia Bank. The rates
on the existing equipment loans drawn range from 4.15% to 7.43%. The rates are specific
to the prevailing rate of the day, loan amount, equipment being financed and term of the
loan. The loans vary from 3-5 years. The facility is secured.
8.
Estimated cash available for future operating activities
$A’000
8.1
Net cash from / (used in) operating activities (item 1.9)
(307)
8.2
(Payments for exploration & evaluation classified as investing
activities) (item 2.1(d))
(57)
8.3
Total relevant outgoings (item 8.1 + item 8.2)
(364)
8.4
Cash and cash equivalents at quarter end (item 4.6)
1,779
8.5
Unused finance facilities available at quarter end (item 7.5)
8.6
Total available funding (item 8.4 + item 8.5)
2,105
8.7
Estimated quarters of funding available (item 8.6 divided by
item 8.3)
5.79
326
Note: if the entity has reported positive relevant outgoings (ie a net cash inflow) in item 8.3, answer item 8.7 as “N/A”.
Otherwise, a figure for the estimated quarters of funding available must be included in item 8.7.
8.8
If item 8.7 is less than 2 quarters, please provide answers to the following questions:
8.8.1
Does the entity expect that it will continue to have the current level of net operating
cash flows for the time being and, if not, why not?
Answer: N/A
8.8.2
Has the entity taken any steps, or does it propose to take any steps, to raise further
cash to fund its operations and, if so, what are those steps and how likely does it
believe that they will be successful?
Answer: N/A
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 4
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
8.8.3
Does the entity expect to be able to continue its operations and to meet its business
objectives and, if so, on what basis?
Answer: N/A
Note: where item 8.7 is less than 2 quarters, all of questions 8.8.1, 8.8.2 and 8.8.3 above must be answered.
Compliance statement
1
This statement has been prepared in accordance with accounting standards and policies which
comply with Listing Rule 19.11A.
2
This statement gives a true and fair view of the matters disclosed.
Date:
24 January 2024
Authorised by: The Board of Directors
(Name of body or officer authorising release – see note 4)
Notes
1.
This quarterly cash flow report and the accompanying activity report provide a basis for informing the market about the
entity’s activities for the past quarter, how they have been financed and the effect this has had on its cash position. An
entity that wishes to disclose additional information over and above the minimum required under the Listing Rules is
encouraged to do so.
2.
If this quarterly cash flow report has been prepared in accordance with Australian Accounting Standards, the definitions
in, and provisions of, AASB 6: Exploration for and Evaluation of Mineral Resources and AASB 107: Statement of Cash
Flows apply to this report. If this quarterly cash flow report has been prepared in accordance with other accounting
standards agreed by ASX pursuant to Listing Rule 19.11A, the corresponding equivalent standards apply to this report.
3.
Dividends received may be classified either as cash flows from operating activities or cash flows from investing activities,
depending on the accounting policy of the entity.
4.
If this report has been authorised for release to the market by your board of directors, you can insert here: “By the board”.
If it has been authorised for release to the market by a committee of your board of directors, you can insert here: “By the
[name of board committee – eg Audit and Risk Committee]”. If it has been authorised for release to the market by a
disclosure committee, you can insert here: “By the Disclosure Committee”.
5.
If this report has been authorised for release to the market by your board of directors and you wish to hold yourself out as
complying with recommendation 4.2 of the ASX Corporate Governance Council’s Corporate Governance Principles and
Recommendations, the board should have received a declaration fr