ASX ANNOUNCEMENT
28 April 2025
QUARTERLY ACTIVITIES REPORT
For the quarter ended 31 March 2025
HIGHLIGHTS
Low-Carbon Cement Development
•
•
•
•
Development of low-carbon cement formulations using industrial byproducts
and calcined kaolin to produce a high-performance, low-cost product.
Commissioning of Stage 1 of the Low-Carbon Concrete Demonstration Plant
upgrades, and completion of engineering design for Stage 2.
Upon completion of the upgrades, the Demonstration Plant will be capable of
producing 2m3 of Green360’s cement free, low-carbon concrete, per hour.
Memorandum of Understanding (MoU) with Wind with Purpose relating to the
supply of concrete products made with low-carbon cement.
Pittong Operations
•
•
•
•
•
•
1
Revenue of A$3.4 million from the Pittong Operations, representing a 7.2%
increase compared to the prior corresponding quarter.
Third consecutive quarter of revenue growth and financial year-to-date
revenue of A$9.6 million.
Pittong Operations financial year-to-date EBITDA of A$0.2 million, representing
two consecutive quarters of positive EBITDA and a significant improvement
from the negative operational earnings of A$1.1 million recorded in FY2024.
Extended sales contract with major customer until December 2027, with an
increase in order volumes of up to 47% on the previous contract.
Extended a major take or pay Offtake Agreement for a further five years,
valued at ~A$6.56 million1.
Successful product development, entry into new markets and strategic
customer engagement efforts, to offtake additional product from Pittong, and
leverage the operation’s nameplate production capacity.
Subject to delivery location and a forecast exchange rate of USD: AUD 0.63:1
Aaron Banks
Executive Chairman
Mark Pensabene
Non-Executive Director
Peter Trinder
Non-Executive Director
Green360 Technologies Ltd. ABN 97 140 316 463
Head Office: Level 11, 40 The Esplanade, Perth, Western Australia 6000
Operations: 3610 Glenelg Highway, Pittong, Victoria 3360
Corporate
•
•
Change of Company Name approved to Green360 Technologies Limited
(ASX:GT3).
Cash position as at 31 March 2025 of ~A$2.5 million.
Green360 Technologies Limited (ASX:GT3) (“GT3” “Green360” or “the Company”) is
pleased to report on its activities for the quarter ending 31 March 2025.
LOW-CARBON CEMENT DEVELOPMENT
The Company continued to pursue the development and production of low-cost, lowcarbon alternatives to Portland cement, utilising industrial byproducts and calcined
kaolin as key inputs to produce a cost-competitive, high-performance product with a
reduced emissions profile.
Pathway to Market
In collaboration with its Joint Venture partner, PERMAcast, the Company progressed its
staged, near-term strategy to bring its low-carbon cement product to market:
1. Optimising formulations – various low-carbon materials are tested and optimised
in a laboratory setting, creating cement vials
2. Testing formulations – low-carbon cement formulations are rolled out into
concrete products via PERMAcast to test for strength, workability, durability,
slump, and other relevant factors
3. Validating cement formulations in concrete products – alongside PERMAcast,
Green360’s low-carbon cement formulations are validated directly with
customers in saleable, ready for market, final concrete products
4. Scale up and delivery – pursuing the distribution of low-carbon cement which
has been validated through the above stages
By partnering with PERMAcast, Green360 is able to validate its low-carbon cement
formulations though real-world applications, working directly with major customers of
pre-cast concrete products such as the mining industry and Government.
During the quarter, the Joint Venture progressed the development and testing of
concrete made using its innovative process by utilising industrial byproducts and/or
calcined kaolin thus reducing the Portland cement component and thereby significantly
reducing the emission profile in line with construction standards and regulatory
demands.
The Joint Venture further advanced on-site activities, initially focused on reducing and
replacing up to 40% of Portland cement and will release the results once the full suite
of testing has been completed.
Additionally, the Joint Venture has continued to progress contractual negotiations with
respect to securing supply agreements for the various inputs required for its low-carbon
cement formulations.
Stage 1 of the Low-Carbon Concrete Demonstration Plant Commissioned
The Company also successfully commissioned Stage 1 of its Low-Carbon Concrete
Demonstration Plant upgrades, comprised of the chemical handling component.
Engineering design was also completed for Stage 2 of the Plant, being the dry material
handling unit. Stage 2 is expected to be commissioned in Q2 of the 2025 calendar year.
The Plant upgrade is a key milestone for Green360 in being able to produce a consistent
commercial quantity of concrete products made with the Company’s low-carbon
cement, allowing the Joint Venture to actively validate low-carbon products in the
marketplace.
Upon completion of the upgrades, the Plant will be capable of producing 2m 3 of
Green360’s cement free, low-carbon concrete, per hour. Additionally, the Plant’s
engineering infrastructure has been designed to seamlessly accommodate future
scalability.
PERMAcast JV Signed MOU with Wind Development Company
The Company’s Joint Venture with PERMAcast executed a Memorandum of
Understanding (MoU) with wind development company Wind with Purpose Pty Ltd
(WWP) pertaining to the potential supply of low-carbon concrete products.
The MoU grants the Joint Venture the first right of refusal to supply concrete made with
Green360’s low-carbon cement for WWP’s potential developments, subject to
successful demonstrations of the viability of the concrete product via a pilot research
project.
WWP plans to install approximately 3 gigawatts of onshore wind and 2 gigawatts of
offshore wind capacity, and if successful, will require the construction of between 400500 wind turbines. The volume of concrete required per foundation for an onshore wind
turbine can exceed 1,000 cubic metres2, with the current commercial value of concrete
being roughly $300 per cubic meter.
The MoU with WWP marked another significant step forward in demonstrating the
viability of concrete products made with Green360’s low-carbon cement in large-scale
infrastructure.
PITTONG OPERATIONS
The Company continued to pursue process improvements and product development
opportunities at its 100%-owned Pittong Operation, located in Victoria 40km west of
Ballarat.
The Pittong processing plant has a nameplate capacity of ~60,000 tonnes per annum,
and, combined with the Trawalla mine, is supported by over 18 million tonnes of Inferred
and Indicated JORC compliant kaolin resources.
The high-performance kaolin from Pittong is used primarily in premium applications
such as, coatings, paint, and specialist industries including pharmaceuticals, cosmetics
2
cte-wind.com
and rubber. Green360 Technologies has ongoing long-term supply partnerships with
world-leading brands for offtake of the Pittong kaolin.
Sale Contracts
The Company generated revenue of A$3.4 million from the Pittong Operations during
the March quarter, representing a 7.2% increase compared to the prior corresponding
quarter. This marks the third consecutive quarter of revenue growth and brings the
financial year-to-date revenue to A$9.6 million.
Green360 extended a major sales contract with Norske Skog until December 2027. The
sales contract covers the supply of the Company’s hydrous kaolin product to Norske
Skog, who estimates it will purchase between 21,000 to 24,000 tonnes of product over
the term of the contract. This represents an increase in order volumes of up to 47% on
the previous contract.
Shortly after extending its major sales contract with Norske Skog, the Company also
extended a major take or pay Offtake Agreement with Chaozhou Chengcheng Industrial
Co. Ltd., relating to the supply of hydrous kaolin from Pittong for a further five years
until 2030.
The Agreement, valued at ~A$6.56 million3, covers a minimum order quantity of 8,750
tonnes of hydrous kaolin over a five-year period under a take or pay arrangement. The
previous three-year deal covered 4,275 tonnes of hydrous kaolin.
The new agreement commenced in February 2025 and operates under the same terms
and conditions as the previous contract.
Contract extensions of large quantities with reputable offtake partners, like Norske
Skog and Chengcheng, demonstrate Green360’s growing sales momentum and
strengthening position as a preferred high-quality kaolin supplier, both for Australianbased companies and internationally.
Strategic Customer Engagement and New Sales
The Company continued to progress customer engagement efforts to offtake additional
product from Pittong and leverage the operation’s 60kt per annum nameplate capacity.
Subsequent to the quarter, the Company executed a contract with a new Japanese
customer for the sale of its kaolin to be used in a new application in the clean energy
space - the conversion of waste to energy through incineration. Green360’s kaolin
provides the key chemical attributes that are required to be successful in this
application.
This marked a key milestone for the Company having successfully created a new
application for its products. The Pittong kaolin has successfully passed all three stages
of testing required by the end-user, including laboratory, small-scale batch trials and
large-scale production trials.
The contract covers the supply of 150 metric tonnes per annum for one incinerator.
3
Subject to delivery location and a forecast exchange rate of USD: AUD 0.63:1
A further four incinerators, significantly larger in size and scale, also successfully
completed the laboratory and small-scale batch trials of the Pittong kaolin, with the
intention to commence the large-scale production trials over the coming months. The
anticipated sales volumes for all the incinerators currently under testing totals ~2,000
metric tonnes per annum.
Successful completion of the test work was a significant step forward in the Company’s
expanded customer engagement strategy, allowing for the breakthrough into nontraditional and new emerging markets. The total market size for this application just in
Japan is estimated to be between 5,000 and 10,000 tonnes annually. The first reference
point now enables the Company to target other potential customers for this same
application - both in Japan and the broader Australasian market.
Processing Improvements and Optimisation
Kaolin processing improvements, cost reduction, and product margins have been a key
focus for the Company. This focus yielded positive results; the Company has generated
two consecutive quarters of positive project-level EBITDA, totalling A$0.2 million for the
financial year-to-date. This marked a significant improvement to the negative
operational earnings of A$1.1 million recorded in FY2024.
The Pittong Operation demonstrated improved financial metrics based on ~35% plant
utilisation. Additional offtake of products from Pittong will enable the Company to
continue to improve and grow its positive financial position.
CORPORATE
Change of Company Name
As of 18 March 2025, and following shareholder approval, the Company’s name and ASX
code changed from Suvo Strategic Minerals Limited (ASX:SUV) to Green360
Technologies Limited (ASX:GT3).
General Meeting
The Company held a General Meeting on the 7th of March 2025. All resolutions put to
the meeting were passed on a poll and without amendment.
Financial Overview
Cash and cash equivalents at the end of the quarter were ~A$2.5 million.
DISCLOSURE REQUIREMENTS (Guidance Note 23 Disclosures)
Details of mining exploration activities:
There were no exploration activities undertaken during the quarter ended 31 March
2025.
Details of mining production and development activities:
The Company spent ~A$2.47 million on hydrous kaolin mining and processing costs and
~A$0.09 million on development activities (excludes exploration & evaluation) during
the quarter ended 31 March 2025.
Details of tenement activities:
The Company holds the following tenements at the end of the quarter:
TENEMENT
PROJECT
OWNERSHIP
CHANGE
E70/5039
Gabbin Kaolin
100%
Nil
E70/5001
Eneabba Silica Sand
100%
Nil
M5408
Pittong Kaolin
100%
Nil
M5409
Trawalla Kaolin
100%
Nil
M5365
Lal Lal Kaolin
100%
Nil
E = Exploration License (granted)
M = Mining Lease (granted)
Details of related party payments:
During the quarter the Company paid A$0.09 million to Directors for Salaries and
Wages.
Approved for release by the Board
-ENDSFor further information, please contact:
Aaron Banks
Executive Chairman
E: aaron.banks@g360tech.au
P: +61 8 9389 4495
Stephanie Richardson
Sodali & Co
E: stephanie.richardson@sodali.com
P: +61 423 459 440
APPENDIX - RESOURCE STATEMENT
As at 30 June 2024
White Kaolinised
Granite (Mt)
ISO Brightness
% (457nm)
Yield
<45um %
Kaolin (Mt)
Indicated
9.9
81.0
27.7
2.8
Inferred
2.8
79.8
28.3
0.8
Total
12.7
80.8
27.8
3.6
Indicated
3.6
81.3
35.5
1.3
Inferred
1.9
79.1
33.0
0.7
Total
5.5
80.5
34.6
2.0
Category
Trawalla Resource
Pittong Resource
Information on the Mineral Resources presented is contained in the ASX announcement dated 27
September 2024. Green360 confirms that it is not aware of any information or data that materially affects
the information included in this announcement and that all material assumptions and technical parameters
underpinning the estimates continue to apply and have not materially changed. The Company confirms that
the form and context in which the Competent Person’s findings are presented have not been materially
modified from the original market announcements.
About Green360 Technologies Limited
Green360 Technologies (ASX:GT3) is an Australian-based building materials company leading the development of lowcost, low-carbon cement to address an immediate demand in the market. Traditional cement production is a major
industrial polluter; Green360 Technologies is using innovative methods to produce an alternative, delivering improved
performance and a reduced emissions profile.
Green360 Technologies is executing a commercialisation plan alongside a reputable market leader, focused on nearterm and widespread industry adoption of the Company's low-carbon cement.
FORWARD-LOOKING STATEMENTS
This release may contain certain forward-looking statements with respect to matters including but not limited to the
financial condition, results of operations and business of GT3 and certain of the plans and objectives of GT3 with respect
to these items.
These forward-looking statements are not historical facts but rather are based on GT3’s current expectations, estimates
and projections about the industry in which GT3 operates and its beliefs and assumptions.
Words such as "anticipates," “considers,” "expects," "intends," "plans," "believes," "seeks," "estimates", "guidance" and
similar expressions are intended to identify forward looking statements and should be considered an at-risk statement.
Such statements are subject to certain risks and uncertainties, particularly those risks or uncertainties inherent in the
industry in which GT3 operates.
These statements are not guarantees of future performance and are subject to known and unknown risks, uncertainties,
and other factors, some of which are beyond the control of GT3, are difficult to predict and could cause actual results
to differ materially from those expressed or forecasted in the forward-looking statements. Such risks include, but are
not limited to resource risk, product price volatility, currency fluctuations, increased production costs and variances in
product grade or recovery rates from those assumed in mining plans, as well as political and operational risks in the
countries and states in which we sell our product to, and government regulation and judicial outcomes. For more detailed
discussion of such risks and other factors, see the Company’s Annual Reports, as well as the Company’s other filings.
GT3 cautions shareholders and prospective shareholders not to place undue reliance on these forward-looking
statements, which reflect the view of GT3 only as of the date of this release.
The forward-looking statements made in this announcement relate only to events as of the date on which the statements
are made.
GT3 will not undertake any obligation to release publicly any revisions or updates to these forward-looking statements
to reflect events, circumstances or unanticipated events occurring after the date of this announcement except as
required by law or by any appropriate regulatory authority.
Rule 5.5
Appendix 5B
Mining exploration entity or oil and gas exploration entity
quarterly cash flow report
Name of entity
Green360 Technologies Limited
ABN
Quarter ended (“current quarter”)
97 140 316 463
31 March 2025
Consolidated statement of cash flows
Current quarter
$A’000
Year to date (9
months)
$A’000
3,292
9,377
(a) exploration & evaluation
-
-
(b) development
-
-
(c) production
(2,467)
(8,267)
(d) staff costs
(423)
(1,308)
(e) administration and corporate costs
(437)
(1,611)
-
-
1.
Cash flows from operating activities
1.1
Receipts from customers
1.2
Payments for
1.3
Dividends received (see note 3)
1.4
Interest received
104
132
1.5
Interest and other costs of finance paid
(18)
(106)
1.6
Income taxes paid
-
-
1.7
Government grants and tax incentives
-
410
1.8
Other (income tax refunds)
-
-
1.9
Net cash from / (used in) operating
activities
51
(1,373)
2.
Cash flows from investing activities
2.1
Payments to acquire or for:
(a) entities
-
-
(b) tenements
-
-
(c) property, plant and equipment
(86)
(343)
(d) exploration & evaluation
(3)
(85)
-
-
(2)
(17)
(e) investments
(f)
other non-current assets
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 1
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
Consolidated statement of cash flows
2.2
Current quarter
$A’000
Year to date (9
months)
$A’000
Proceeds from the disposal of:
(a) entities
-
-
(b) tenements
-
-
(c) property, plant and equipment
-
-
(d) investments
-
-
(e) other non-current assets
-
-
2.3
Cash flows from loans to other entities
-
-
2.4
Dividends received (see note 3)
-
-
2.5
Other
-
-
2.6
Net cash from / (used in) investing
activities
(91)
(445)
3.
Cash flows from financing activities
3.1
Proceeds from issues of equity securities
(excluding convertible debt securities)
-
2,000
3.2
Proceeds from issue of convertible debt
securities
-
-
3.3
Proceeds from exercise of options
-
-
3.4
Transaction costs related to issues of equity
securities or convertible debt securities
-
(120)
3.5
Proceeds from borrowings
-
-
3.6
Repayment of borrowings
(163)
(502)
3.7
Transaction costs related to loans and
borrowings
-
-
3.8
Dividends paid
-
-
3.9
Other (repayment of lease liabilities)
(53)
(202)
3.10
Net cash from / (used in) financing
activities
(216)
1,176
4.
Net increase / (decrease) in cash and
cash equivalents for the period
4.1
Cash and cash equivalents at beginning of
period
2,740
3,126
4.2
Net cash from / (used in) operating
activities (item 1.9 above)
51
(1,373)
4.3
Net cash from / (used in) investing activities
(item 2.6 above)
(91)
(445)
4.4
Net cash from / (used in) financing activities
(item 3.10 above)
(216)
1,176
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 2
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
Consolidated statement of cash flows
4.5
Effect of movement in exchange rates on
cash held
4.6
Cash and cash equivalents at end of
period
5.
Reconciliation of cash and cash
equivalents
at the end of the quarter (as shown in the
consolidated statement of cash flows) to the
related items in the accounts
5.1
Bank balances
5.2
Current quarter
$A’000
Year to date (9
months)
$A’000
-
-
2,484
2,484
Current quarter
$A’000
Previous quarter
$A’000
2,484
2,740
Call deposits
-
-
5.3
Bank overdrafts
-
-
5.4
Other (cash held in term deposit)
-
-
5.5
Cash and cash equivalents at end of
quarter (should equal item 4.6 above)
2,484
2,740
6.
Payments to related parties of the entity and their
associates
6.1
Aggregate amount of payments to related parties and their
associates included in item 1
94
6.2
Aggregate amount of payments to related parties and their
associates included in item 2
-
Current quarter
$A'000
Note: if any amounts are shown in items 6.1 or 6.2, your quarterly activity report must include a description of, and an
explanation for, such payments.
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 3
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
7.
Financing facilities
Note: the term “facility’ includes all forms of financing
arrangements available to the entity.
Add notes as necessary for an understanding of the
sources of finance available to the entity.
Total facility
amount at quarter
end
$A’000
Amount drawn at
quarter end
$A’000
7.1
Loan facilities
-
-
7.2
Credit standby arrangements
-
-
7.3
Other (equipment finance facility)
1,000
411
7.4
Total financing facilities
1,000
411
-
7.5
Unused financing facilities available at quarter end
7.6
Include in the box below a description of each facility above, including the lender, interest
rate, maturity date and whether it is secured or unsecured. If any additional financing
facilities have been entered into or are proposed to be entered into after quarter end,
include a note providing details of those facilities as well.
589
The facility is an equipment finance facility provided by National Australia Bank. The rates
on the existing equipment loans drawn range from 4.15% to 7.43%. The rates are specific
to the prevailing rate of the day, loan amount, equipment being financed and term of the
loan. The loans vary from 3-5 years. The facility is secured.
8.
Estimated cash available for future operating activities
$A’000
8.1
Net cash from / (used in) operating activities (item 1.9)
51
8.2
(Payments for exploration & evaluation classified as investing
activities) (item 2.1(d))
(3)
8.3
Total relevant outgoings (item 8.1 + item 8.2)
48
8.4
Cash and cash equivalents at quarter end (item 4.6)
8.5
Unused finance facilities available at quarter end (item 7.5)
8.6
Total available funding (item 8.4 + item 8.5)
8.7
Estimated quarters of funding available (item 8.6 divided by
item 8.3)
2,484
589
3,073
N/A
Note: if the entity has reported positive relevant outgoings (ie a net cash inflow) in item 8.3, answer item 8.7 as “N/A”.
Otherwise, a figure for the estimated quarters of funding available must be included in item 8.7.
8.8
If item 8.7 is less than 2 quarters, please provide answers to the following questions:
8.8.1
Does the entity expect that it will continue to have the current level of net operating
cash flows for the time being and, if not, why not?
Answer: N/A
8.8.2
Has the entity taken any steps, or does it propose to take any steps, to raise further
cash to fund its operations and, if so, what are those steps and how likely does it
believe that they will be successful?
Answer: N/A
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 4
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
8.8.3
Does the entity expect to be able to continue its operations and to meet its business
objectives and, if so, on what basis?
Answer: N/A
Note: where item 8.7 is less than 2 quarters, all of questions 8.8.1, 8.8.2 and 8.8.3 above must be answered.
Compliance statement
1
This statement has been prepared in accordance with accounting standards and policies which
comply with Listing Rule 19.11A.
2
This statement gives a true and fair view of the matters disclosed.
Date:
28 April 2025
Authorised by: The Board of Directors
(Name of body or officer authorising release – see note 4)
Notes
1.
This quarterly cash flow report and the accompanying activity report provide a basis for informing the market about the
entity’s activities for the past quarter, how they have been financed and the effect this has had on its cash position. An
entity that wishes to disclose additional information over and above the minimum required under the Listing Rules is
encouraged to do so.
2.
If this quarterly cash flow report has been prepared in accordance with Australian Accounting Standards, the definitions
in, and provisions of, AASB 6: Exploration for and Evaluation of Mineral Resources and AASB 107: Statement of Cash
Flows apply to this report. If this quarterly cash flow report has been prepared in accordance with other accounting
standards agreed by ASX pursuant to Listing Rule 19.11A, the corresponding equivalent standards apply to this report.
3.
Dividends received may be classified either as cash flows from operating activities or cash flows from investing activities,
depending on the accounting policy of the entity.
4.
If this report has been authorised for release to the market by your board of directors, you can insert here: “By the board”.
If it has been authorised for release to the market by a committee of your board of directors, you can insert here: “By the
[name of board committee – eg Audit and Risk Committee]”. If it has been authorised for release to the market by a
disclosure committee, you can insert here: “By the Disclosure Committee”.
5.
If this report has been authorised for release to the market by your board of directors and you wish to hold yourself out as
complying with recommendation 4.2 of the ASX Corporate Governance Council’s Corporate Governance Principles and
Recommendations, the board should have received a declaration from its CEO and CFO that, in their opinion, the financial
records of the entity have been properly maintained, that this report complies with the appropriate accounting standards
and gives a true and fair view of the cash flows of the entity, and that their opinion has been formed on the basis of a
sound system of risk management and internal control which is operating effectively.
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.